December 27, 2010, as part of the ONGC ICP-R contract, Gunanusa and AGJV must perform a field string test at the fabrication yard. String test is normally done at the factory, to assure the equipment assembled can perform according the specification. Due to the time constraint, in the Process Gas Module, 1 set Kawasaki Vertical Split Centrifugal Compressor coupled with a Solar Titan Gas Turbine string test was successfully performed by Gunanusa at the yard.