TUNU DEVELOPMENT - SISI NUBI PRODUCTION SEPARATION (SNPS)
Total Indonesie E&P operates the Tunu gas and condensate field in East Kalimantan on the outer margin of the Mahakam delta with an average water depth of 8 m. Total has awarded Gunanusa to perform Engineering, Procurement, Construction and Installation of almost all of the phases of the development.
Sisi Nubi Production Separation Platform (SNPS) has a 12 legs 3500 tonnes intergrated topside including finger type slug catcher separator, pipe racks, pig receiver, and open/close drain drum.