PECIKO DEVELOPMENT PHASE 3 - SATELLITE WELLHEAD PLATFORM (SWP-G)

Total E&P operates the Peciko gas and condensate field at the offshore of East Kalimantan, with a water depth from 30m to 50m, south of the Mahakam River Delta. Gunanusa has won several contracts for the Peciko Development Phases.

For Peciko Offshore Developments Phase 3, Gunanusa fabricated the new Satellite Wellhead Platform (SWP-G) and 20" sea line connection SWP-G and the existing MWP-A, and also the modification to existing facility (MWP-A). The plant design life is 20 years. The construction and installation, completed in October,2002, include the deck (1200 tonnes) and jacket (800 tonnes).