TUNU DEVELOPMENT - OILY WATER TREATMENT PLATFORM (OWT)
Total Indonesie E&P operates the Tunu gas and condensate field in East Kalimantan on the outer margin of the Mahakam delta with an average water depth of 8 m. Total has awarded Gunanusa to perform Engineering, Procurement, Construction and Installation of almost all of the phases of the development.
Gunanusa fabricated and installed the 700 tonnes Tunu Oily Water Treatment (OWT) to process produced water before disposal. The project consists of a 800 tonnes piles, manifold, and piping. It was completed in February, 2003