Current Projects  
 

HESS - Ujung Pangkah Central Processing Platform (CPP) and Auxiliary & Utility Platform (AUP)


CPP & AUP at Gunanusa Fabrication Yard

Hess operates the Ujung Pangkah area at East Java in shallow water at 10 m depth. Gunanusa has been awarded to perform Engineering, Construction, Hook Up and Commissioning of Central Processing Platform (CPP) and Auxiliary & Utility Platform (AUP).


CPP has a 2650 tonnes upper deck with an 260 tonnes jacket, the platform consists of processing module, gas/liquid separation, gas compression, liquids pumping and produced water handling, water treatment and disposal.

AUP has a topsides weight of 2080 tonnes with a 260 tonnes jacket. AUP will accommodate 35 persons and a Control Building located on the Cellar Deck which is comprised of the Motor Control Centre (MCC) room, Transformer Room, Local Equipment Room (LER) and workshops area. The platforms have been installed at Ujung Pangkah on March, 2011.


AUP platform at Ujung Pangkah

AUP module being load out

CPP & AUP at Ujung Pangkah